{"id":1625,"date":"2012-02-29T21:17:40","date_gmt":"2012-02-29T21:17:40","guid":{"rendered":"http:\/\/www.compositestoday.com\/?p=1625"},"modified":"2012-04-01T15:17:36","modified_gmt":"2012-04-01T15:17:36","slug":"premier-composite-technologies-awarded-composite-roof-contract","status":"publish","type":"post","link":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/","title":{"rendered":"Premier Composite Technologies Awarded Composite Roof Contract"},"content":{"rendered":"<p>Premier Composite Technologies has signed a contract to supply the roofing and inner ceiling for one of the Haramain High Speed Railway stations \u2013 the Medinah Station.<br \/>\n<!--more-->&nbsp;<br \/>\nPremier Composite Technologies will supply Yapi Merkezi \u2013 SBG Consortium, who have been granted turnkey construction of both the Mecca and Medinah railway stations for the Haramain project, with the advanced composite roof and interior ceiling panels for the entire surface area of 26,000m2. All panels will be built out of advanced composite materials so that they can be easily lifted into place and installed on site. Production at PCT will begin in June 2012.<br \/>\n&nbsp;<br \/>\nThe contract was awarded to PCT after they worked with project architects Foster + Partners during the initial design phase to create a prototype roofing panel built out of a composite solution that would meet both complex architects designs, as well as all fire and safety regulations.<br \/>\n&nbsp;<br \/>\nDuring this design phase, PCT manufactured a 1:1 prototype panel measuring aprox. 13m2, that was structurally built using a fire resistant sandwich of glass fibre and epoxy resin semi-preg combined with a lightweight core. 2048 of the panels will be required for the entire surface.<br \/>\n&nbsp;<br \/>\nThe Haramain High Speed Railway project is a 444km high speed intercity rail transport system that is under construction in Saudi Arabia.&nbsp; The railway network will link the cities of Medinah, Mecca and Jeddah via the King Abdullah Economic City.<br \/>\n&nbsp;<br \/>\nConnecting each line, will be four railway passenger stations that will be based at each of the cities. Each of the stations have been designed by Foster + Partners, alongside engineering firm Buro Happold.<br \/>\n&nbsp;<br \/>\nThe signing of the contract with PCT follows the successful build and installation of the composite cladding, facades, clock faces and clock hands of the Dokaae Clock Tower, KSA, that was completed by PCT at the end of 2011.<\/p>\n<p>[raw][connections id=&#8217;58&#8217;][\/raw]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Premier Composite Technologies has signed a contract to supply the roofing and inner ceiling for one of the Haramain High Speed Railway stations \u2013 the Medinah Station.<\/p>\n","protected":false},"author":2,"featured_media":1626,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[147],"tags":[356,327],"class_list":["post-1625","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","tag-pct","tag-saudi-arabia"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Premier Composite Technologies Awarded Composite Roof Contract - Composites Today<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Premier Composite Technologies Awarded Composite Roof Contract - Composites Today\" \/>\n<meta property=\"og:description\" content=\"Premier Composite Technologies has signed a contract to supply the roofing and inner ceiling for one of the Haramain High Speed Railway stations \u2013 the Medinah Station.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/\" \/>\n<meta property=\"og:site_name\" content=\"Composites Today\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/compositestoday\" \/>\n<meta property=\"article:published_time\" content=\"2012-02-29T21:17:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2012-04-01T15:17:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i2.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"247\" \/>\n\t<meta property=\"og:image:height\" content=\"247\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"John Shury\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@compositestoday\" \/>\n<meta name=\"twitter:site\" content=\"@compositestoday\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"John Shury\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/\"},\"author\":{\"name\":\"John Shury\",\"@id\":\"https:\/\/www.compositestoday.com\/#\/schema\/person\/2255d6443dbc2184a1d531f1b359b589\"},\"headline\":\"Premier Composite Technologies Awarded Composite Roof Contract\",\"datePublished\":\"2012-02-29T21:17:40+00:00\",\"dateModified\":\"2012-04-01T15:17:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/\"},\"wordCount\":319,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1\",\"keywords\":[\"pct\",\"saudi arabia\"],\"articleSection\":[\"Construction\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/\",\"url\":\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/\",\"name\":\"Premier Composite Technologies Awarded Composite Roof Contract - Composites Today\",\"isPartOf\":{\"@id\":\"https:\/\/www.compositestoday.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1\",\"datePublished\":\"2012-02-29T21:17:40+00:00\",\"dateModified\":\"2012-04-01T15:17:36+00:00\",\"author\":{\"@id\":\"https:\/\/www.compositestoday.com\/#\/schema\/person\/2255d6443dbc2184a1d531f1b359b589\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1\",\"width\":\"247\",\"height\":\"247\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.compositestoday.com\/#website\",\"url\":\"https:\/\/www.compositestoday.com\/\",\"name\":\"Composites Today\",\"description\":\"Latest news and information from the composites industry\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.compositestoday.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.compositestoday.com\/#\/schema\/person\/2255d6443dbc2184a1d531f1b359b589\",\"name\":\"John Shury\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.compositestoday.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6c08fedc5099d3dee55496cafdd820609f7d3a7d0cc782004d01e08173baf1ba?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/6c08fedc5099d3dee55496cafdd820609f7d3a7d0cc782004d01e08173baf1ba?s=96&d=mm&r=g\",\"caption\":\"John Shury\"},\"description\":\"John has served in the composites industry for over 15 years in administration, sales and management roles and is the founder of Composites Media\",\"sameAs\":[\"http:\/\/www.compositestoday.com\",\"https:\/\/x.com\/compositestoday\"],\"url\":\"https:\/\/www.compositestoday.com\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Premier Composite Technologies Awarded Composite Roof Contract - Composites Today","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/","og_locale":"en_US","og_type":"article","og_title":"Premier Composite Technologies Awarded Composite Roof Contract - Composites Today","og_description":"Premier Composite Technologies has signed a contract to supply the roofing and inner ceiling for one of the Haramain High Speed Railway stations \u2013 the Medinah Station.","og_url":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/","og_site_name":"Composites Today","article_publisher":"http:\/\/www.facebook.com\/compositestoday","article_published_time":"2012-02-29T21:17:40+00:00","article_modified_time":"2012-04-01T15:17:36+00:00","og_image":[{"width":247,"height":247,"url":"https:\/\/i2.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1","type":"image\/jpeg"}],"author":"John Shury","twitter_card":"summary_large_image","twitter_creator":"@compositestoday","twitter_site":"@compositestoday","twitter_misc":{"Written by":"John Shury","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#article","isPartOf":{"@id":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/"},"author":{"name":"John Shury","@id":"https:\/\/www.compositestoday.com\/#\/schema\/person\/2255d6443dbc2184a1d531f1b359b589"},"headline":"Premier Composite Technologies Awarded Composite Roof Contract","datePublished":"2012-02-29T21:17:40+00:00","dateModified":"2012-04-01T15:17:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/"},"wordCount":319,"commentCount":0,"image":{"@id":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1","keywords":["pct","saudi arabia"],"articleSection":["Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/","url":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/","name":"Premier Composite Technologies Awarded Composite Roof Contract - Composites Today","isPartOf":{"@id":"https:\/\/www.compositestoday.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#primaryimage"},"image":{"@id":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1","datePublished":"2012-02-29T21:17:40+00:00","dateModified":"2012-04-01T15:17:36+00:00","author":{"@id":"https:\/\/www.compositestoday.com\/#\/schema\/person\/2255d6443dbc2184a1d531f1b359b589"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.compositestoday.com\/2012\/02\/premier-composite-technologies-awarded-composite-roof-contract\/#primaryimage","url":"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1","width":"247","height":"247"},{"@type":"WebSite","@id":"https:\/\/www.compositestoday.com\/#website","url":"https:\/\/www.compositestoday.com\/","name":"Composites Today","description":"Latest news and information from the composites industry","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.compositestoday.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.compositestoday.com\/#\/schema\/person\/2255d6443dbc2184a1d531f1b359b589","name":"John Shury","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.compositestoday.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/6c08fedc5099d3dee55496cafdd820609f7d3a7d0cc782004d01e08173baf1ba?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6c08fedc5099d3dee55496cafdd820609f7d3a7d0cc782004d01e08173baf1ba?s=96&d=mm&r=g","caption":"John Shury"},"description":"John has served in the composites industry for over 15 years in administration, sales and management roles and is the founder of Composites Media","sameAs":["http:\/\/www.compositestoday.com","https:\/\/x.com\/compositestoday"],"url":"https:\/\/www.compositestoday.com\/author\/admin\/"}]}},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2012\/02\/HARAMAIN-HIGH-SPEED-RAILWAY-thunmb.jpg?fit=247%2C247&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p1v6ak-qd","amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/posts\/1625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/comments?post=1625"}],"version-history":[{"count":0,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/posts\/1625\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/media\/1626"}],"wp:attachment":[{"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/media?parent=1625"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/categories?post=1625"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/tags?post=1625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}