{"id":11183,"date":"2014-07-16T21:26:49","date_gmt":"2014-07-16T20:26:49","guid":{"rendered":"http:\/\/www.compositestoday.com\/?p=11183"},"modified":"2014-07-17T09:30:57","modified_gmt":"2014-07-17T08:30:57","slug":"northrop-grumman-atk-complete-james-webb-backplane-testing","status":"publish","type":"post","link":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/","title":{"rendered":"Northrop Grumman &#038; ATK Complete James Webb Backplane Testing"},"content":{"rendered":"<h3>Northrop Grumman and its partner ATK have completed static testing of the primary mirror backplane support structure (PMBSS) for NASA\u2019s James Webb Space Telescope<\/h3>\n<p>The static testing demonstrates that the backplane has the structural integrity to withstand the forces and vibrations of launch, and is the final test prior to starting the integration of the backplane with the rest of the telescope.<\/p>\n<p>The support is one of the most lightweight structures ever designed and built. It is the stable platform that will hold the telescope\u2019s science instruments and the 18 beryllium mirror-segments that form the 21-foot-diameter primary mirror nearly motionless while the telescope peers into deep space.<\/p>\n<p>Northrop Grumman is under contract to NASA\u2019s Goddard Space Flight Centre in Greenbelt, Maryland, and heads up the industry team that designs and develops the Telescope\u2019s optics, sunshield and spacecraft. ATK designed, engineered and manufactured the more than 10,000 parts of the entire structure at its facilities in Magna, Utah. They used composite parts, lightweight graphite materials, contemporary material sciences and advanced fabrication techniques to build the structure.<\/p>\n<p>Scott Texter, Webb optical telescope element manager, Northrop Grumman said;<\/p>\n<blockquote><p>This is the largest, most complex cryogenically stable structure humans have ever built. Completion of the static testing verifies that it can hold the weight it is designed to hold. Now the structural backbone of the observatory is officially verified and ready for integration.<\/p><\/blockquote>\n<p>In Autumn last year the structure underwent extreme cryogenic thermal testing at Marshall Space Flight Centre in Huntsville, Alabama. Next, Northrop Grumman will integrate the composite structures with the deployment mechanisms to create the overall optical telescope element structure, which will then be shipped to NASA Goddard for integration with the mirrors. NASA and Northrop Grumman will continue cryogenic testing of the PMBSS structure after mirror integration is complete.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Northrop Grumman and its partner ATK have completed static testing of the primary mirror backplane support structure (PMBSS) for NASA\u2019s James Webb Space Telescope The static testing demonstrates that the backplane has the structural integrity to withstand the forces and vibrations of launch, and is the final test prior to starting the integration of the backplane with the rest of the telescope. The support is one of the most lightweight structures ever designed and built. It is the stable platform [&hellip;]<\/p>\n","protected":false},"author":33,"featured_media":11188,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[139,512],"tags":[71,336,283],"class_list":["post-11183","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aerospace-aviation","category-composites-news","tag-atk","tag-nasa","tag-northrop-grumman"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Northrop Grumman &amp; ATK Complete James Webb Backplane Testing<\/title>\n<meta name=\"description\" content=\"Northrop Grumman and its partner ATK have completed static testing of the primary mirror backplane support structure for NASA\u2019s James Webb Space Telescope\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Northrop Grumman &amp; ATK Complete James Webb Backplane Testing\" \/>\n<meta property=\"og:description\" content=\"Northrop Grumman and its partner ATK have completed static testing of the primary mirror backplane support structure for NASA\u2019s James Webb Space Telescope\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/\" \/>\n<meta property=\"og:site_name\" content=\"Composites Today\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/compositestoday\" \/>\n<meta property=\"article:author\" content=\"compositestoday\" \/>\n<meta property=\"article:published_time\" content=\"2014-07-16T20:26:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2014-07-17T08:30:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i2.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"752\" \/>\n\t<meta property=\"og:image:height\" content=\"595\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Andrew Brooks\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@compositestoday\" \/>\n<meta name=\"twitter:site\" content=\"@compositestoday\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Andrew Brooks\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/\"},\"author\":{\"name\":\"Andrew Brooks\",\"@id\":\"https:\/\/www.compositestoday.com\/#\/schema\/person\/87bdf2515d4a4de9ae3007c8a5bef449\"},\"headline\":\"Northrop Grumman &#038; ATK Complete James Webb Backplane Testing\",\"datePublished\":\"2014-07-16T20:26:49+00:00\",\"dateModified\":\"2014-07-17T08:30:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/\"},\"wordCount\":308,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1\",\"keywords\":[\"ATK\",\"NASA\",\"Northrop Grumman\"],\"articleSection\":[\"Aerospace\",\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/\",\"url\":\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/\",\"name\":\"Northrop Grumman & ATK Complete James Webb Backplane Testing\",\"isPartOf\":{\"@id\":\"https:\/\/www.compositestoday.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1\",\"datePublished\":\"2014-07-16T20:26:49+00:00\",\"dateModified\":\"2014-07-17T08:30:57+00:00\",\"author\":{\"@id\":\"https:\/\/www.compositestoday.com\/#\/schema\/person\/87bdf2515d4a4de9ae3007c8a5bef449\"},\"description\":\"Northrop Grumman and its partner ATK have completed static testing of the primary mirror backplane support structure for NASA\u2019s James Webb Space Telescope\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1\",\"width\":752,\"height\":595},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.compositestoday.com\/#website\",\"url\":\"https:\/\/www.compositestoday.com\/\",\"name\":\"Composites Today\",\"description\":\"Latest news and information from the composites industry\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.compositestoday.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.compositestoday.com\/#\/schema\/person\/87bdf2515d4a4de9ae3007c8a5bef449\",\"name\":\"Andrew Brooks\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.compositestoday.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/191ebb1ebaf66a73a19b6df54ff446b7935c6993d1a5b4659abd277df8e3bd22?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/191ebb1ebaf66a73a19b6df54ff446b7935c6993d1a5b4659abd277df8e3bd22?s=96&d=mm&r=g\",\"caption\":\"Andrew Brooks\"},\"description\":\"Andy has been in the composites industry for over 8 years in both sales and management positions for blue-chip companies in the UK.\",\"sameAs\":[\"http:\/\/www.compositesmedia.com\",\"compositestoday\",\"http:\/\/www.linkedin.com\/profile\/view?id=224294494&locale=en_US&trk=tyah&trkInfo=tarId1396020406189tasandrewbrooksidx1-1-1\",\"https:\/\/x.com\/compositestoday\",\"compositesshowcase\"],\"url\":\"https:\/\/www.compositestoday.com\/author\/andybrooks\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Northrop Grumman & ATK Complete James Webb Backplane Testing","description":"Northrop Grumman and its partner ATK have completed static testing of the primary mirror backplane support structure for NASA\u2019s James Webb Space Telescope","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/","og_locale":"en_US","og_type":"article","og_title":"Northrop Grumman & ATK Complete James Webb Backplane Testing","og_description":"Northrop Grumman and its partner ATK have completed static testing of the primary mirror backplane support structure for NASA\u2019s James Webb Space Telescope","og_url":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/","og_site_name":"Composites Today","article_publisher":"http:\/\/www.facebook.com\/compositestoday","article_author":"compositestoday","article_published_time":"2014-07-16T20:26:49+00:00","article_modified_time":"2014-07-17T08:30:57+00:00","og_image":[{"width":752,"height":595,"url":"https:\/\/i2.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1","type":"image\/jpeg"}],"author":"Andrew Brooks","twitter_card":"summary_large_image","twitter_creator":"@compositestoday","twitter_site":"@compositestoday","twitter_misc":{"Written by":"Andrew Brooks","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#article","isPartOf":{"@id":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/"},"author":{"name":"Andrew Brooks","@id":"https:\/\/www.compositestoday.com\/#\/schema\/person\/87bdf2515d4a4de9ae3007c8a5bef449"},"headline":"Northrop Grumman &#038; ATK Complete James Webb Backplane Testing","datePublished":"2014-07-16T20:26:49+00:00","dateModified":"2014-07-17T08:30:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/"},"wordCount":308,"commentCount":0,"image":{"@id":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1","keywords":["ATK","NASA","Northrop Grumman"],"articleSection":["Aerospace","News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/","url":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/","name":"Northrop Grumman & ATK Complete James Webb Backplane Testing","isPartOf":{"@id":"https:\/\/www.compositestoday.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#primaryimage"},"image":{"@id":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1","datePublished":"2014-07-16T20:26:49+00:00","dateModified":"2014-07-17T08:30:57+00:00","author":{"@id":"https:\/\/www.compositestoday.com\/#\/schema\/person\/87bdf2515d4a4de9ae3007c8a5bef449"},"description":"Northrop Grumman and its partner ATK have completed static testing of the primary mirror backplane support structure for NASA\u2019s James Webb Space Telescope","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.compositestoday.com\/2014\/07\/northrop-grumman-atk-complete-james-webb-backplane-testing\/#primaryimage","url":"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1","width":752,"height":595},{"@type":"WebSite","@id":"https:\/\/www.compositestoday.com\/#website","url":"https:\/\/www.compositestoday.com\/","name":"Composites Today","description":"Latest news and information from the composites industry","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.compositestoday.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.compositestoday.com\/#\/schema\/person\/87bdf2515d4a4de9ae3007c8a5bef449","name":"Andrew Brooks","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.compositestoday.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/191ebb1ebaf66a73a19b6df54ff446b7935c6993d1a5b4659abd277df8e3bd22?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/191ebb1ebaf66a73a19b6df54ff446b7935c6993d1a5b4659abd277df8e3bd22?s=96&d=mm&r=g","caption":"Andrew Brooks"},"description":"Andy has been in the composites industry for over 8 years in both sales and management positions for blue-chip companies in the UK.","sameAs":["http:\/\/www.compositesmedia.com","compositestoday","http:\/\/www.linkedin.com\/profile\/view?id=224294494&locale=en_US&trk=tyah&trkInfo=tarId1396020406189tasandrewbrooksidx1-1-1","https:\/\/x.com\/compositestoday","compositesshowcase"],"url":"https:\/\/www.compositestoday.com\/author\/andybrooks\/"}]}},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.compositestoday.com\/wp-content\/uploads\/2014\/07\/webb-scope.jpg?fit=752%2C595&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p1v6ak-2Un","amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/posts\/11183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/users\/33"}],"replies":[{"embeddable":true,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/comments?post=11183"}],"version-history":[{"count":0,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/posts\/11183\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/media\/11188"}],"wp:attachment":[{"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/media?parent=11183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/categories?post=11183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.compositestoday.com\/wp-json\/wp\/v2\/tags?post=11183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}